• Energy Saving Air Jet Loom
  • Energy Saving Air Jet Loom
  • Energy Saving Air Jet Loom
  • Energy Saving Air Jet Loom
  • Energy Saving Air Jet Loom
  • Energy Saving Air Jet Loom

Energy Saving Air Jet Loom

Type: Air Jet Loom
Voltage: 380V
Computerized: Computerized
Precision: Precision
Certification: CE, ISO9001: 2000
Warranty: 3 Years
Samples:
US$ 60000/Piece 1 Piece(Min.Order)
| Request Sample
Customization:
Diamond Member Since 2015

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company, Group Corporation
  • Overview
  • Product Description
  • Detailed Photos
  • Product Parameters
  • Certifications
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
JLH9200
Customized
Customized
Condition
New
After-sales Service
3 Year
Advising Fabric
Terry Towel
Advising Shedding
Crank, Cam, Dobby, Jacquard
Advising Color
2/4/6/8
Max.Speed(r.p.m)
1200
Transport Package
Bulk Bag
Specification
190cm-360cm
Trademark
JLH
Origin
Qingdao, China
HS Code
84463050
Production Capacity
300 Sets Per Month

Product Description

Product Description

1.brief description
our machine is a new model air jet loom with new ultra-stable rack,new rear beam structure,multi-support balanced beating machine,active warp loose system,energy saving reed,to ensure high speed and smooth operation of looms,reduce air consumption,increase the weave range.
2.advantages:
Wide weaving range, stable operation, saving gas and electricity, reducing production cost and improving production efficiency. Compared with other models, it can save 20%-30% of electricity, and the efficiency can reach more than 90%. The machine is moved down, making the operation more convenient.

Detailed Photos

Energy Saving Air Jet LoomEnergy Saving Air Jet LoomEnergy Saving Air Jet LoomEnergy Saving Air Jet LoomEnergy Saving Air Jet LoomEnergy Saving Air Jet Loom

Product Parameters
  plain cam dobby jacquard
shedding jinlihua bintian, staubli songhe
feeder Domestic Jinlihua, imported ROJ
Electronic let-off
Electronic take-up
Electrical appliances
Frequency conversion speed control possible
Baina (same as North Vietnam Technology in Japan)
Main nozzle,
sub nozzle
Swiss Jet (made in China)
Electromagnetic valve Japan SMC
Gearing in box Germany FAG, SKF, Japan NSK, NACHI
Oil seal Japan NOK
Heald frame Domestic Jinlihua, imported new light, J-type heald frame (cam dobby), O-type heald frame (crank)
Electric machinery Qingdao National Defense
Display screen MCGS Taiwan
Certifications

Our company has self-operated import and export operations It has obtained the ISO9001: 2000 national quality management certification system, and the European Union's CE certification.Energy Saving Air Jet Loom

Company Profile

Our company was established in 1973 and has more than 40 years of production experience. The main products are gauze air-jet looms, economical air-jet looms, high-end air-jet looms, high-end water-jet looms, etc.
Energy Saving Air Jet Loom

FAQ

(1) Q: Are you a manufacturer or agency? A: We are a professional manufacturer holding our own International Trade Department, for that can better understand customer's needs and offer a reasonable price. (2) Q: Are you available for on-the-spot invitation? A: We do welcome our new and old friends come here to have a visitation. Besides, we would send you our exposition and relative information to promote a face-to-face meeting if you'd like to. (3) Q: Is the price offered changeable? A: We offer reasonable price for every client, and the price is changeable according to purchasing amount. (4) Q: How about the quality? A: The main subassembly and raw materials are all supplied by large companies. Key parts are research and developed by our own staff. Professional assembly line work and strict quality test system can ensure your high quality requirement. (5) Q: How's the after-sale service? A: We offer engineers available to service overseas under merchandiser's supervision and translation. (6) Q: What about the delivery time? A: General delivery time is 20 days or so for one container after we recieved your downpayment. If the order is less and we have stocks also, the delivery time is 10 days or so. If our factory is busy, then we will negotiate the time according to our production plan.
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now